Project Control and Monitoring
Rakennetyyppi: | Opintojakso |
---|---|
Koodi: | IPM1005 |
OPS: | IPM 2023T |
Taso: | Tradenomi (ylempi AMK) |
Opiskeluvuosi: | 1 (2023-2024) |
Lukukausi: | Kevät |
Laajuus: | 5 op |
Vastuuopettaja: | Butt, Aurangzeab |
Opetuskieli: | Englanti |
Toteutukset lukuvuonna 2023-2024
Tot. | Ryhmä(t) | Opiskeluaika | Opettaja(t) | Kieli | Ilmoittautuminen |
---|---|---|---|---|---|
3006 | IPM2023-1, TPM2023-1 | 4.3.2024 – 19.5.2024 | Aurangzeab Butt | Englanti | 1.12.2023 – 12.1.2024 |
Osaamistavoitteet
The student knows more detailed the principles of project management and project control, knows how to control the project implementation. The student knows the principles of cost and resource control and risk management and can utilize project management tools, and apply Project Management Institute (PMI) best practices for project, program and portfolio management
Opiskelijan työmäärä
Total work load of the student 135 h, of which
- scheduled studies 25 h
- autonomous studies 110 h
The assessment of student’s own learning 1 h is included in contact lessons.
Edeltävät opinnot / Suositellut valinnaiset opinnot
Basics of Project Management or equivalent knowledge
Sisältö
Forming a project organization, schedule, resource and cost planning, project control, follow up and reporting, risk management and project management tools.
Opiskelumateriaali
A Guide to the Project Management Body of Knowledge (PMBOK Guide), 4th or newer edition.
SFS-ISO 21500, Guidance on Project Management
Other material given by lecturer
Opetusmuoto / Opetusmenetelmät
Lectures, project work and exercises
Arviointikriteerit
5: The student is able to utilize the methods learnt during the study unit independently and is able apply the learnt knowledge in new contexts.
3: The student is able to utilize the methods learnt during the study unit independently.
1: The student is able, with guidance, to utilize the methods learnt during the study unit.
Arviointimenetelmät
Numerical assessment: Numerical assessment: examination 50%, project work 50%