Scheduling of Building Project

Structure Type: Study unit
Code: IRTS2103
Type: Optional obligatory / Professional Studies
Curriculum: I-RT 2010 / 2010V / 2011 / 2012 / 2013
RT 2014 / 2015 / 2016
Level: Bachelor of Engineering
Year of Study: 3 (2012-2013 / 2013-2014 / 2014-2015 / 2015-2016 / 2016-2017 / 2017-2018 / 2018-2019)
Credits: 4 cr
Responsible Teacher: Laaja, Martti
Language of Instruction: Finnish

Courses

Impl.Group(s)Study TimeTeacher(s)LanguageClassesEnrolment
1I-RT-3N, I-YT-3N2013-01-07 – 2013-04-26Petri TurtiainenFinnish 2012-12-07 – 2013-03-04
2I-RT-3V2013-01-07 – 2013-04-26Petri TurtiainenFinnish 2012-12-07 – 2013-03-04
3I-RT-3N2014-01-06 – 2014-05-03Martti LaajaFinnish 2013-12-09 – 2014-01-10
4I-RT-3N2015-01-05 – 2015-05-02Martti LaajaFinnish 2014-12-08 – 2015-01-12
5I-RT-3N2016-01-04 – 2016-05-07Minna UimonenFinnish 2015-12-07 – 2016-01-10
6I-RT-3N2017-01-09 – 2017-04-30Minna UimonenFinnish 2016-12-12 – 2017-01-16
7I-RT-3N, I-RT-3V2018-01-08 – 2018-05-26Martti LaajaFinnish 2017-12-11 – 2018-01-15
9I-RT-3N2019-01-07 – 2019-04-30Martti LaajaFinnish44 h2018-12-10 – 2019-01-14

The descriptions shown below are for the academic year: 2018-2019

Learning Outcomes

The student will get familiar with production planning for the implementation phase of a house construction project and receives basic information on production control methods. The student knows the basic concepts and scheduling and resourcing methods. The student is able to draw up a schedule and resource plan for a house contriction project.

Student's Workload

Total work load of the course: 108 h
- of which scheduled studies: 56 h
- of which autonomous studies: 52 h
The assessment of student’s own learning 1 h is included in contact lessons.

Prerequisites / Recommended Optional Courses

Cost Calculation and Tendering

Contents

Forms and levels of schedules, consolidation of schedules in a company, slash scheduling, synchronisation and rhythming of construction work, schedule monitoring and schedule control.

Recommended or Required Reading and Other Learning Resources/Tools

Ratu-aikataulukirja. 2008. Rakennustieto Oy .

Kankainen, J.; Sandvik, T. 1999. Rakennushankkeen ohjaus. rakennustieto Oy.

Koski, H. 2000. Rakennushankkeen tuotannonsuunnittelu ja –ohjaus. rakennustieto oy.

Mode of Delivery / Planned Learning Activities and Teaching Methods

Lectures, application examples, assignment. The study unit is part of Site Planning common core theme.

Assessment Criteria

Grade 1: The student knows the contents of the study unit that are relevant in working life.
Grade 3: The student is able to utilise the information and skills learnt during the study unit.
Grade 5: The student is able to utilise and apply the information and skills learnt during the study unit.

Assessment Methods

Exam and written assignment. Numerical assessment.