VAMK

Change language: Suomi

Front Page > Study Search > Project Management (IEYX0910)

Project Management

Structure Type: Study unit
Code: IEYX0910
Type: Compulsory
Curriculum: ET 2018 / 2019 / 2020 / 2021 / 2022 / 2023 / 2024
EY 2023V
YT 2018 / 2019 / 2020 / 2021 / 2022 / 2023 / 2024
Level: Bachelor of Engineering
Year of Study: 1 / 2 (2018-2019 / 2019-2020 / 2020-2021 / 2021-2022 / 2022-2023 / 2023-2024 / 2024-2025)
Semester: Spring / Autumn
Credits: 5 cr
Responsible Teacher: Vikström, Thomas
Language of Instruction: Finnish

Courses

Impl.Group(s)Study TimeTeacher(s)LanguageEnrolment
1I-ET-1N, I-YT-1N2019-01-07 – 2019-04-30Jukka HautalaFinnish2018-12-10 – 2019-01-14
2I-ET-1N, I-YT-1N2019-09-02 – 2019-12-20Marko Rantasalo, Sami ElomaaFinnish2019-08-19 – 2019-09-09
3001ET2020-1, ET2020-1A, ET2020-1B, YT2020-1, YT2020-1A, YT2020-1B2020-08-01 – 2020-12-31Asseri Laitinen, Sami Elomaa, Toni LustilaFinnish2020-08-17 – 2020-09-11
3002ET2021-1A, ET2021-1B, ET2021-1C, ET2021-1D2021-08-01 – 2021-12-31Petri SaariFinnish2021-08-01 – 2021-09-06
3003YT2021-1A, YT2021-1B, YT2021-1C, YT2021-1D2021-08-01 – 2021-12-31Thomas Vikström, Toni LustilaFinnish2021-08-01 – 2021-09-06
3006ET2022-1, ET2022-1A, ET2022-1B, ET2022-1C, ET2022-1D2022-07-31 – 2022-12-30Thomas VikströmFinnish2022-07-31 – 2022-09-04
3007YT2022-1, YT2022-1A, YT2022-1B, YT2022-1C, YT2022-1D2022-08-29 – 2022-12-30Thomas VikströmFinnish2022-08-01 – 2022-09-06
3009ET2023-1A, ET2023-1B, ET2023-1C, ET2023-1D2023-08-28 – 2023-12-17Thomas VikströmFinnish2023-08-01 – 2023-09-06
3011YT2023-1A, YT2023-1B, YT2023-1C, YT2023-1D2023-08-28 – 2023-12-17Thomas VikströmFinnish2023-08-01 – 2023-09-06
3013EY2023V-2, EY2023V-2A, EY2023V-2B2025-01-07 – 2025-05-25Kenneth NorrgårdFinnish 
3014ET2024-1, ET2024-1A, ET2024-1B, ET2024-1C, ET2024-1D2024-09-03 – 2024-12-20Thomas VikströmFinnish2024-08-01 – 2024-09-06
3015YT2024-1, YT2024-1A, YT2024-1B2024-09-02 – 2024-12-20Thomas VikströmFinnish2024-08-01 – 2024-09-06

The descriptions shown below are for the academic year: 2024-2025

Learning Outcomes

The student knows the principles of project management, can make a project plan and lead the project in execution. The student knows the principles of time, cost and resource management in projects and uderstands the importance of risk management. The student can make the schedule, set the resources and estimate the costs of the project using MsProject software.

Student's Workload

Total work load of the student 135 h including scheduled studies and autonomous work.

Contents

Building up a project organisation, making a project plan, project time, cost and resource planning, project control, follow up and reporting. Scheduling and resourcing the project, estimating the costs of the project using project planning software. Basics of 3D-design with an easy to use browser software. Group work in form of a project where a 3D-printer is first assembled and used to print a miniature model of a wind mill or other own designed model, and later disassembled.

Recommended or Required Reading and Other Learning Resources/Tools

Risto Pelin: Projektinhallinnan käsikirja.
A Guide to the Project Management Body of Knowledge (PMBOK, Project Mangement Institute)
SFS-ISO 21500 Ohjeita projektinhallinnasta, Suomen standardisoimisliitto SFS 2012.
MSProject –ohjelmisto.

Mode of Delivery / Planned Learning Activities and Teaching Methods

Lectures, group work, exercises, project work.

Assessment Criteria

5: The student is able to utilize the methods and concepts of project management independently in challenging contexts of project management.
3: The student is able to use the methods andd concepts of project management and understands their importance for successfull projects.
1: The student recognize and uderstands different methods and concepts of project management.

Assessment Methods

Numerical assessment: written exam and project assignment.


Back